rates & fees

Benefit Unit Rates as of JULY 1, 2023

Meter SizeMeter TypeBenefit Unit CostMonthly Service ChargeWater Rate

5/8" x 3/4"

PD$8,470 $22.71 $0.701/100 Gallons

3/4"

PD$12,160 $22.71 $0.701/100 Gallons

1"

PD$20,600 $22.71 $0.701/100 Gallons

1 1/2"

PD$39,700 $39.41 $0.701/100 Gallons

2"

PD$61,800 $63.87 $0.701/100 Gallons

2"

C$61,800 $63.87 $0.701/100 Gallons

In addition to the Benefit Unit Cost, a Road Crossing Fee will be implemented, (if applicable) dependent on the size of installation. Fees are: 5/8″ and 3/4″ size $2,200; 1″ size $2,500; 1 1/2″ and 2″ size $3,000. Additional charges may apply if the actual cost for the road crossing exceeds the deposit. 2-inch and smaller meters: District provides, installs and pays for all pipe and equipment through the meter, including meter pit. Property Owner pays for all materials and installation beyond the meter.

Fire line fees as of March 1, 2023

Connection SizeApplication FeeConnection FeeTotal FeesMonthly Service Charge
2$1,000 $1,000 $2,000.00 $27.05
4$1,000 $1,000 $2,000.00 $40.59
6$2,000 $2,000 $4,000.00 $54.09
8$2,000 $4,000 $6,000.00 $70.54
10$3,000 $5,000 $8,000.00 $126.86
12$3,000 $7,000 $10,000.00 $204.91
>12TBDTBDTBDTBD

Fire Hydrant Meters are available for temporary use

fire hydrant meter rates as of jULY 1, 2023

Refundable Security Deposit

$1,500.00

Capacity Fee

(Renewable upon every 300,000 gallons of usage or every 3 months)

$3,600.00

Monthly Minimum

$81.95

Water Rate$0.946/100 Gallons

miscellaneous fees as of September 1, 2021

Engineering StudyTBD by Project Size
Credit Card FeeTBD by 3rd Party
Flow Tests

$150.00

Returned Check Fee

$25.00

Transfer Fee

$25.00

Reconnect Fee During Hours

$30.00

After Hours Reconnect Fee